Construyendo el Mega Horno Túnel de Malasia | Trabajos de Cimentación del Proyecto Brictec CBT

Tunnel Kiln
September 05, 2025
Brief: Únase a nosotros para una mirada de cerca a la construcción del Mega Horno Túnel de Malasia, con las Obras de Cimentación del Proyecto Brictec CBT. Este video muestra el diseño innovador y el control preciso de la temperatura del nuevo quemador de gas natural para hornos túnel, destacando su uniformidad de cocción y eficiencia en los procesos de fabricación y cocción de ladrillos.
Related Product Features:
  • Fully-automatic production system integrating raw coal metering, crushing, drying, feeding, and burning.
  • Suitable for all continuous firing kilns using top-fed pulverized coal combustion.
  • Comprehensive hardware setup including coal storage silo, crusher, conveyor, dryer, and burner.
  • Advanced software system for data acquisition, analysis, processing, and feedback adjustment.
  • Supports up to 12 coal feeding points with maximum flow of 180m³/h per point.
  • Operates with 380V voltage and 24V auxiliary power in temperatures from -10 to 50℃.
  • Designed for pulverized coal with particle size ≤5mm, moisture ≤5%, and calorific value ≥6000 cal.
  • Global deployment across Asia, Middle East, Europe, Africa, and South America with local service centers.
Las preguntas:
  • What types of kilns is the PCS Series pulverized coal firing system suitable for?
    The system is designed for all continuous firing kilns that utilize top-fed pulverized coal combustion, making it versatile for various brick and tile production setups.
  • What are the key components included in the system's hardware?
    The hardware includes a raw coal storage silo, scale conveyor belt, coal crusher, screw conveyor, pulverized coal dryer, dust collector, chain feeder, and pulverized coal burner.
  • How does the system ensure precise control and automation?
    It features integrated software with data acquisition, analysis, processing, control, and feedback adjustment units, enabling fully-automatic operation and monitoring.
  • What are the required specifications for the pulverized coal used in this system?
    The coal should have a maximum particle size of ≤5mm, moisture content ≤5%, sulfur content ≤4%, Hardgrove grindability index ≥50, and calorific value ≥6000 cal.